Sitemap | Language | Links
 
 
 

Applications of UV Inspection during
Commissioning

 

DayCor® is a solution because it can

• Reveal inadequate design
• Reveal missing components
• Reveal wrong hardware installations
• Reveal mismatching components
• Pinpoint problems promptly
• Find damaged mistreated components
• Check thoroughly before connecting to customers
• Check while contractors are on site
• Efficiency and money saving
• Guarantee full customers satisfaction

Reveal problems in new installations

During commissioning utilities wish to reveal problems before current flows to their customers and before contractors leave the site. Detecting system faults is crucial but finding them easily and quickly makes the difference for companies that try to save time, money and guarantee customers’ satisfaction.

Provide solutions for the short and long term

Corona and arcing activities on brand new installations are indications of inadequate system design such as: cables’ dimension, bundles size, pole height, mismatching grading rings etc. DayCor®
can easily spot such cases of inadequate design and indicate the exact faulty location.

Help assuring the reliability of your grid

While using the DayCor•® for corona and arcing inspection the absence of components - such as corona rings and misc hardware components - is easily indicated. Furthermore, components that during shipment or installation got damaged, or components of a defective batch, will also be revealed with the DayCor®.

Instant diagnosis

Wrong installations such as: grading rings that are mounted backward, unfastened splices, loose tie wires etc., are instantly detected with Corona cameras as are sharp angles and sharp edges, cracks, broken cable strands and, loose spacers, dampers and other components.

Why DayCor®?

The DayCor® camera is an outstanding tool since it promptly enables pinpointing sources of corona in full daylight. The DayCor® streamlines the testing phase, cuts labor costs and assists in delivering a new thoroughly checked and flawless systems.

 

   
Printable version 
Refer a colleague
   

capacitor bank - sharply bent cables

Capacitor bank with sharply bent cables

Hot-End Grading Ring Installed Backwards

Hot-End Grading Ring Installed Backwards


Ground-End Grading Ring Not Installed

Ground-End Grading Ring Not Installed

 
     
 
 
     
   Copyright © 1998-2007 Ofil Ltd. All rights reserved. Reproduction in whole or in part without permission is prohibited. webmaster@ofilsystems.com